Completion: 155 Aztec West, Bristol

After: what the building looks like now works are complete

gcp Chartered Architects would like to congratulate Rydon Construction on the successful completion of Cat A+works at 155 Aztec West, Bristol.  The project was managed by BNP Paribas Real Estate for the institutional owner.  The project involved replacement of all windows and mechanical and electrical services as well as the introduction of a new shower area.  The entrance has been greatly enhanced with the addition of a new entrance lobby extension with a new boardroom at first floor.

Before: outside 155 Aztec West, Bristol