Complete: Westbury Swimarium

Sarah Harris and Rick Johnstone, of the Swim School Ltd, came to gcp with a challenge: to design and deliver their ‘Swimarium’ in Westbury, Wiltshire. Being a retrofit of a former warehouse made the brief a little unusual.  The pool itself had already been procured, leaving the challenge of accommodating the ancillary facilities and plant in the remaining space.

The pool occupies approximately a 100m2 footprint, within a building that has a 230m2 gross internal area. Necessary accommodation also included: An entrance hallway, an accessible wc, 2 changing rooms, a viewing gallery, lockers, a plant room, a chemical store, raised teaching walkways and compliant escape routes; making the spatial tolerances are extremely fine. 

gcp undertook all the design work from the initial feasibility study through to concept, planning and technical design stage. The warehouse underwent an extensive thermal and structural upgrade, with half the roof accommodating solar pv panels. gcp also supported the construction team throughout, with the design calling for some unique detailing around the piled pool slab, teaching walkways and external walls. All credit goes to the contractor, Hill Project Management, who ran the build stage diligently and professionally, under significant time constraints.

Recently we were also pleased to be invited along to the grand opening. With a long waiting list and thousands of satisfied customers, we hope that this will be one of many more Swimariums to come!

David Murray John Building, the Number One Wonder of Swindon

David Murray John tower block above the Brunel Centre

A feasibility study to explore potential redevelopment options for the David Murray John Building, an iconic 21 storey 1970’s tower block in the centre of Swindon situated above the Brunel Shopping Centre. Known as the Number One Wonder of Swindon, originally designed and built by the local authority, the building has over 3,500 sq metres of office accommodation on floors 2 to 13 and 72 flats from floors 14 to 21 flats. The office accommodation has been vacant for several years, the cladding has come to the end of its economic life and the services installations needs a major overhaul.

The study investigates a range of interventions including complete recladding and a wide range of alternative uses. The report sits with the council awaiting further instruction.

Avonmouth Community Centre Asset Transfer

Avonmouth Community Centre proposed ground floor plan

Avonmouth Community Centre proposed ground floor plan

Housed in a former Victorian primary school, Avonmouth Community Centre is a well used and much-loved community facility on the edge of Avonmouth Docks.

In line with council policy the management team were invited to bid to transfer the ownership via community asset transfer. With financial support from the Port Communities Resilience Fund the community association appointed gcp Chartered Architects to prepare a feasibility study to investigate the potential to increase revenue streams and secure existing tenancies for this popular community centre.  

gcp devised a phased development plan that allowed for the progressive refurbishment as capital grants became available. Detailed design work are due to commence in the New Year.